Error catalogueDPPdpp.battery.datapoint.voltage

DPP validation error: Battery datapoint voltage

This appears when the required field is absent, null or blank at the path reported by the finding.

BlockingFix at the source

Educational guide only — this module is not part of the current public offer.

What the check requires

The passport must include minimal, nominal and maximum voltage (with temperature ranges where relevant).

A blocking error — this record cannot pass deterministic validation until it is resolved.

Why this is reported

This appears when the required field is absent, null or blank at the path reported by the finding. The deterministic DPP validator reports it as rule dpp.battery.datapoint.voltage. The requirement and citation come from versioned profile 1.0.2; Clearlane does not replace them with an AI-generated verdict.

How it gets fixed

Follow the finding path and add the required source data or evidence named in the rule message. Run validation again. Clearlane never fills a compliance value by guessing.

CitationRegulation (EU) 2023/1542, Annex XIII, point 1(h)profile 1.0.2 · Effective from 2027-02-18 · captured 2026-07-11