
EUDR country risk classification: low, standard or high
Regulation (EU) 2025/1093 lists 140 low-risk and 4 high-risk countries. Everything else — Brazil, Indonesia, Côte d'Ivoire — is standard risk by default.
Read the articleFocused explanations for the supplier data and geolocation work behind a defensible EUDR process. Every article shows its author, reviewer, sources and correction history.

Regulation (EU) 2025/1093 lists 140 low-risk and 4 high-risk countries. Everything else — Brazil, Indonesia, Côte d'Ivoire — is standard risk by default.
Read the article
Article 25 sets a floor under the ceiling: national maximum fines must reach at least 4% of EU-wide turnover. Here is the full list, and what bites before any fine.
Read the article
"Needs evidence" is not a fail and not a pass. Here is what Regulation (EU) 2023/1115 Article 11(1) lets you do next, and why the satellite result never flips to clear.
Read the article
The European Commission publishes its own list of 15 common EUDR GeoJSON file errors. What each one means, and which ones a geometry check never sees.
Read the article
A swapped coordinate pair is only refused when it leaves the valid range. Below 90 degrees of longitude it passes every EUDR check and still points at the wrong land.
Read the article
How an EUDR due diligence statement moves through the EU Information System, and the 72-hour window to amend or withdraw it once the reference number lands.
Read the article
A plot boundary that crosses itself blocks an EUDR GeoJSON file. Splitting it clears the check and changes the land you are declaring — so it stays your decision.
Read the article
The EUDR size limit that bites is on the assembled declaration, not your upload: 25,000,000 bytes of geolocation, plus commodity and producer ceilings.
Read the article
Article 13 simplified due diligence drops the Article 10 and 11 work when all sourcing is low risk. Article 4a is a separate one-time route for small growers.
Read the article
A KML is already in WGS84, so there is nothing to reproject. The work is everything else — placemarks that aren't plots, attributes buried in ExtendedData, six decimals.
Read the article
Reproject to WGS84 and export GeoJSON — then fix the six things the conversion leaves behind: winding, holes, multipart records, precision, field names, point or polygon.
Read the article
The EUDR four-hectare rule in plain terms — when a single coordinate is enough, when you need a polygon, and why a point with no Area is read as four hectares.
Read the article
Every blocking check an EUDR GeoJSON file has to pass, five causes worth checking first, and what a clean file still does not prove.
Read the article
A satellite check that says "clear" is not proof. Here is what an EUDR deforestation check can and cannot establish, and what a defensible record looks like.
Read the article
ESPR fixes the requirements every EU digital product passport must meet. What goes inside one is decided per product group, in its own delegated act.
Read the article
Under Regulation (EU) 2023/1115 an operator files a due diligence statement and carries the liability. A trader only passes information on. Here is how to tell which.
Read the article
Regulation (EU) 2023/1115 lets you ship only when risk is no more than negligible. Here is what Article 10 asks you to weigh, and when low-risk sourcing lets you skip it.
Read the article
Regulation (EU) 2023/1115 keeps cattle, cocoa, coffee, oil palm, rubber, soya and wood off the EU market unless they are deforestation-free, legal and declared.
Read the article
A cited step-by-step EUDR checklist: which date applies, the geolocation rules, declaration routes, filing limits, and what a file check cannot prove.
Read the article
What an EUDR due diligence statement must contain, who submits it, why the reference number arrives late, and the point at which you can no longer change it.
Read the article
The EU digital product passport comes from Regulation (EU) 2024/1781 (ESPR). The framework is already law, but each product group waits for its own delegated act.
Read the article
CBAM puts a carbon cost on certain imports — cement, steel, aluminium, fertilisers, hydrogen and electricity — so EU and non-EU producers compete on a level footing.
Read the article
The EUDR applies on 30 December 2026 or 30 June 2027 depending on business size, role and product. Use this practical date checklist.
Read the article
A practical guide to EUDR API V3: UUID-first submissions, delayed reference numbers, simplified declarations, grouping and GeoJSON checks.
Read the article
A practical EUDR GeoJSON checklist: the four-hectare point-versus-polygon rule, coordinate precision, file structure and what validation cannot prove.
Read the articleYou're chatting with Clearlane's AI assistant. Answers come from cited official rules; it is not legal advice.